Top

Massman Construction Company Uses HeavyBid on Marseilles Lock and Dam

By HCSS
hcss logo white

HCSS

marketing.content@hcss.com

From headquarters in Sugar Land, TX right outside of Houston, HCSS is recognized as a pioneer and leader in construction software, with thousands of companies relying on the platform daily for all of their industry needs.

Massman was involved in the rebuild of tainter gates of the active Marseilles Lock and Dam on the Illinois River just south of Chicago. Five of the eight tainter gates on the dam were damaged by a runaway tow of barges that lost power upstream of the dam. The most critical damage was to gate trunnions, hinges that anchor the gate to the dam. The trunnions between Gates 2 and 3 were severely damaged, and the anchor beam was broken off. Gate 2 was sent downstream and wedged within the dam gate piers.

What makes it interesting?

Repair work will be carefully staged to reduce flooding risk to the city of Marseilles and local areas.

How HCSS Software assisted with this project

HeavyBid helped Massman with efficient estimating and tracking of past dam construction productions.

Read More About This Project