The Victory Pipeline – a CMGC project in Duchesne County, UT – is a 16.5-mile major water transmission pipeline that transports wholesale potable water to seven retail water companies or cities.
HCSS understands that contractors focused on the construction of underground utilities such as communications, sewers, water lines, storm drainage, culverts, and tunnels that require replacement, repair, and/or new installations need estimating software to help them manage complex bids with accuracy and speed.
HeavyBid software is used as a utility estimating solution that is designed to develop estimated costs with pinpoint accuracy and produce proposals that span all civil industries and disciplines, including underground utilities. HeavyBid’s versatility allows civil construction estimators to break complex problems into solvable pieces that accurately capture the costs and streamline an entire construction estimating process so estimators can get accurate bids out the door in significantly less time.
[HeavyJob] Project Management provides a central hub for everything you need to track or access in managing a project.

Jarrod LaRocco
Bond Civil & Utility Construction
Estimating
Submit competitive bids faster by eliminating manual entry, organizing complex costs, and simplifying submissions while seamlessly managing bids from backlog to execution.
Operations
Capture time cards, site conditions, photos, and progress reports to give project managers and executives a complete view of every project, no matter where it is.
Fleet
Fleet management software built specifically for the heavy civil industry to help you maximize utilization, streamline operations, meet compliance standards, and reduce overall costs.
Make tedious, time-consuming paperwork a thing of the past.
See how HCSS software can boost your profits by calling 888-244-8577 or scheduling a demo today.