Mascaro Construction Company Uses HeavyBid on CSX J&L Tunnel
In the CSX J&L Tunnel Improvements project, Mascaro had to carefully design-build the removal of an existing rail tunnel roof under […]
In the CSX J&L Tunnel Improvements project, Mascaro had to carefully design-build the removal of an existing rail tunnel roof under […]
This project involved the demolition and reconstruction of the Spectra Energy Needham Regulator Station. The team demolished the existing regulator, installed […]
The ATI Brackenridge project involved intensive amounts of time and effort. Multiple estimates, including various scope changes and tight schedules, made […]
Mascaro’s scope of work for the Vallourec Star Fine Quality Mill project included over 150,000 cubic yards of excavation, 75,000 cubic […]
The CONSOL Energy Pump Stations and Pipelines project included 18 miles of High Density Polyethylene (HDPE) pipeline through tough, hilly West […]
BOND worked with Northeast Utilities to complete the Stamford Reliability Cable Project. Work started in March and ended in November 2014. […]
The American Tobacco Trail project consisted of a pedestrian trail with a signature bridge over I-40 in Durham, North Carolina. The bridge […]
The Eagle P3 commuter rail project connects downtown Denver, Colorado, with the Denver International Airport. The Eagle P3 is a $2.2 billion […]
All of AAA’s projects are diverse, which makes them very interesting. The Harris County Precinct 3 Hockley Soap Box Derby Track located […]
The Demolition and Safe Storage Enclosure Construction for 105-N and 109-N Buildings included demolition of concrete structures around the reactor area, steam […]
The CPV St. Charles Reclaimed Water project includes construction of 71,000 feet of 18-inch waterline, requiring every possible means of waterline installation […]
The Oiltanking Houston Ship Dock 8/9 project involved construction of a new ship loading facility around an existing ship dock while it […]