Lewis and Tibbitts was the general contractor for Phase 1 of the Undergrounding of Overhead Utilities Project at Pebble Beach. This was the first phase of a larger ambitious project to bring all of the utilities underground in Pebble Beach. The project scope included over 11,000 feet of conduit installed for the three utilities, over 80 vaults and pull-boxes, and a complete repaving of a half-mile section of road. With a highly skilled workforce and plugged-in management team, Lewis and Tibbitts has the expertise and experience to complete a project of this magnitude. This project was featured in several local papers that gave a very favorable view of this project and the company.
What makes it interesting?
Pebble Beach is one of the premier golf locations in the world and has been host to countless high profile golf tournaments and the fabled Concours de Elegance annual car show. This project is will be a key part of making this beautiful resort even more desirable as it eliminates the overhead utilities from view and creates a more reliable system that is not threatened by storms or falling branches.
How HCSS Software assisted with this project
Lewis and Tibbitts’ estimators relied on HeavyBid to accurately track and estimate every bid item in order to have the most competitive number possible. We are convinced that HeavyBid greatly assisted in compiling and winning this complicated bid. This project also served as a turning point for Lewis and Tibbitts as this was the pilot project for using HeavyJob in our company. This experience taught us to use the many powerful tools in HeavyJob and enable us to track later jobs more accurately.