Mascaro Construction was the Engineering, Procurement and Construction (EPC) contractor for the PNG 20-Inch Pipeline Replacement Project. This project involved installing 6.5 miles of new 20-inch gas pipeline and a 3,200-linear-foot directional bore under the Conemaugh River.
What makes it interesting?
This design-build project included installing pipeline beneath the Conemaugh River, railroad tracks, and highway areas. Complications involved included permitting and right-of-way land acquisition.
How HCSS Software assisted with this project
Flexibility of the HeavyBid system, especially in analyzing self-performance versus subcontractors, was critical in developing the most competitive proposal during the bid phase.