Ford Construction Uses HeavyJob & HeavyBid on Highway 88
The Highway 88 Carson Pass Project used controlled blasting techniques to lay back the existing vertical rock slope to a 3/4:1 slope, […]
The Highway 88 Carson Pass Project used controlled blasting techniques to lay back the existing vertical rock slope to a 3/4:1 slope, […]
Carolina Bridge Company was asked by the NCDOT to construct the Pea Island Emrgency Bridge, a 662-foot bridge to allow the […]
The North Meadows Extension – Tributary B Outfall in Castle Rock, CO involved the installation of a 10-foot by 6-foot CBC at […]
The Connective Corridor was a three-phase project in which 24 city blocks were fully reconstructed and subsequently connected Syracuse University to downtown […]
This Liberty Plaza Project involved demolition of 50-year-old parking deck next to the Georgia State Capitol, import of 20,000 cubic yards of […]
Located in Montgomery County, Pennsylvania, this 30-month, $200 million project is a 6-mile staged construction for full-depth roadway reconstruction and Widening […]
The I-25 Rubbilization Project is on an existing four-lane freeway near Fort Collins, Colorado. The project consisted of rubblization of the existing […]
The South Arizona Avenue Project was a streetscape project consisting of four-lane roadway improvements and wide pedestrian corridors from Frye Road to […]
The Boardwalk Trail at Lady Bird Lake is a spectacular structure stretching and meandering along the lake shoreline for nearly a […]
The AMP Willow Island Powerhouse presented geotechnical challenges given the jobsite’s tight location. Ruhlin had to work around existing site challenges within […]
Gray & Son bid the Fairfield Parking Lot based on one single plan sheet and was awarded the job based on quantities […]
The Bell Boulevard Easterly Extension project involved construction of a four-lane arterial road and bridge with an observation deck over the Moira […]