Working directly for Kinder Morgan in LaPorte, Texas on the BOSTCO project, WT Byler performed Site clearing and grubbing of over 200 acres, excavated and embanked over 300,000 cubic yards of on-site earth material, imported and embanked 350,000 cubic yards of structural fill material, installed a storm water system, and installed a tur-key railroad system, including storage and on-site overpass. Materials included: fire water pipe syste (32,065 linear feet); lime stabilization (1,500 tons); crushed concrete (51,560 tons).
What makes it interesting?
This job used 225,000 man hours, and the work was completed multi-phased with no lost time recordable accidents.
How HCSS Software assisted with this project
WT Byler won the project by utilizing HeavyBid to determine cost. Then once on site, they utilized Equipment360 and FuelerPlus to maintain their fleet. They tracked their transport-trucks and heavy-machinery with HCSS GPS for the project duration.